Scope of Work: Construction of approximately 1.200 feet of finish stream channel and 1.400 feet of rough graded stream channel. The major work elements include excavation, stockpiling, stream bank protection, gravel pools, bed control, relocating the existing asphalt trail, and removing trees. Other work includes but is not limited to temporary traffic control, temporary erosion. Sediment control (TESC), seeding and mulching disturbed areas, and other work necessary to complete the project.