NE 178th St. Improvements Phase 2

Scope of Work: This Contract provides for the improvement of NE 178th Street and 35th Avenue NE. The work to be performed under this contract will be bid in three schedules of work. Schedule A: Street Improvements includes widening and reconstructing the pavement section on NE 178th Street between 33rd Avenue NE and Brookside Boulevard, constructing cement concrete curb, gutter and sidewalk improvements on both sides of the roadway, construction of cement concrete curb gutter and sidewalk on the east side of 35th Avenue NE, between NE 178th Street and the driveway entrance to Brookside Elementary School, culvert replacement on the McAleer Creek crossing of NE 178th Street, storm system improvements, two rapid flashing beacons, utility relocation coordination, beam guardrail, fencing, driveway grading, retaining walls, signing, channelization and surface restoration. Schedule B: North City Water District Water Main Relocation includes trench excavation, backfill, 8-inch ductile iron water main replacement, fire hydrant relocation water services and connecting to the existing North City Water District water system. Schedule C includes a 1-year guarantee on the Schedule A work. Schedule D: Lake Forest Park Water District Water Main Relocation includes trench excavation, backfill, 8-inch ductile iron water main and 2-inch HDPE water main replacement, water services and connecting to existing Lake Forest Park Water District water system.