NE 4th Extension Stage 1

Scope of Work: New roadway from 116th Ave NE to the Burlington Northern Santa FE Rail Road Right of Way including construction of MSE Walls, drainage systems, sidewalk, curb & gutter, asphalt paving, and other work. -Modifications to the existing intersection of NE 4th St and 116th Ave NE including traffic signal modifications, ramp construction, and grind and overlay.